
Wrapping core

Working on vibracore head early morning

Working on core rig

Vibracore vibrator head, most of the 27 ft structure is under the water in
this photograph

Vibracore head and support structure under water during coring operation

Vibracore being retrieved during the sunset

Splitting core

Splitting core

Logging and analyzing vibracore

Labeling core

Field observations

CPE support boat with the bypassing plant on the background

CPE support boat verifying core location

CPE researcher, vibracore head and CPE support boat

Archiving sampled core

Analyzing and logging vibracore