CPE
surveyors conducted a mean high water survey for purposes of establishing
the erosion control line along 5.3 miles of beach. The northern segment
was the most recent of over twenty such mean high water line surveys
conducted throughout Florida by CPE surveyors. Surveys and processing
followed the guidelines of the Department of Environmental Protection
(DEP). The survey was tied into DEP range monuments and second order
massive monuments.